In 2014, a complex of 23 interconnected dome structures was constructed.

Participation in the project:
  • Construction works
(Spain)
Commercial real estate
Tilda Publishing
Completed projects
Mineral Fertilizer Terminal
2023 - a complex of domes with a total capacity
Urea Granulation Production
2022 - dome warehouse with a vibrofloor with a capacity of 30,000 tons
Mineral Fertilizer Terminal
2021 - a complex of dome warehouses with a total capacity of 1 million tons
Urea Granulation Plant
2019 - dome warehouse with a capacity of 15,000 tons
Mineral Fertilizer Terminal
2013 - Complex in the territory of the Muuga port, Tallinn
Seaport Bulk Cargo Terminal
2021 - a complex of 8 domes with a total capacity
2015 - dome structure (diameter 70 m, height 28 m)
2014 - Complex of 23 interconnected dome structures
2016 - 11 dome structures (diameter 11.5 m, height 5.5 m)
Cement Clinker Silos
2012 - 2 silos, each with a capacity of 125,000 tons (diameter 64 m, height 47 m)
Leave your request, and we will contact you shortly
"LLC 'BALTTERMINALSTROY'
OGRN: 1147847163254
INN: 7811580098
KPP: 781601001"
Feel free to contact us through:
Email: bts@btstroi.ru
Phone: +7 (931) 210-60-52
Contacts
Email: bts@btstroi.ru
Phone: + 7 (931) 210-60-52
By clicking the 'Submit' button, you agree to our privacy policy and authorize the processing of your personal data.
Made on
Tilda